• Construction of a 120m² porcelain patio using light grey slabs to achieve a clean, contemporary finish.

  • Patio installed to run along the left-hand side of the property and continue around the rear elevation.

  • Finished at door level in line with the client brief, requiring careful level design and build-up works.

  • Full excavation of the existing ground carried out to remove unsuitable material and prepare the site.

  • Formation levels rebuilt using structural block retaining to support the raised patio arrangement.

  • New access steps constructed as part of the level transition works.

  • Retaining walls faced in stone cladding to provide both structural protection and a durable finished appearance.

  • Slimline drainage channels installed to manage surface water effectively at the raised threshold level.

  • Three front entrance planters constructed and clad in matching charcoal slabs to coordinate with the overall scheme.

  • Project delivered to a high standard with close attention to build quality, detailing, and client requirements.