Construction of a 120m² porcelain patio using light grey slabs to achieve a clean, contemporary finish.
Patio installed to run along the left-hand side of the property and continue around the rear elevation.
Finished at door level in line with the client brief, requiring careful level design and build-up works.
Full excavation of the existing ground carried out to remove unsuitable material and prepare the site.
Formation levels rebuilt using structural block retaining to support the raised patio arrangement.
New access steps constructed as part of the level transition works.
Retaining walls faced in stone cladding to provide both structural protection and a durable finished appearance.
Slimline drainage channels installed to manage surface water effectively at the raised threshold level.
Three front entrance planters constructed and clad in matching charcoal slabs to coordinate with the overall scheme.
Project delivered to a high standard with close attention to build quality, detailing, and client requirements.